21 Oct 2021, 14:14
1. Remove the Relationships tied to the Key Event in question.
2. This will allow you to remove the now unconnected MIEs from the Summary table. There will be a red button allowing you to remove the entry in the circled area below. You'll only want to remove the entry for the Key Event in question.
3. Now select Add key event (KE) from the bottom of the same table and navigate to the desired Key Event, adding it back to the table as a KE (or whichever event type is desired).
4. Recreate the relationships from Step 1 with the now correct Key Event in the Relationships Between Two Key Events (Including MIEs and AOs) table.
5. Update Sequence in the Summary of the AOP table.
2. This will allow you to remove the now unconnected MIEs from the Summary table. There will be a red button allowing you to remove the entry in the circled area below. You'll only want to remove the entry for the Key Event in question.
3. Now select Add key event (KE) from the bottom of the same table and navigate to the desired Key Event, adding it back to the table as a KE (or whichever event type is desired).
4. Recreate the relationships from Step 1 with the now correct Key Event in the Relationships Between Two Key Events (Including MIEs and AOs) table.
5. Update Sequence in the Summary of the AOP table.